Project Investor
This version is used during the negotiation, construction and operating phases of a project.
- The user sets the design configuration including all plant capacities.
- The user sets the draw down of funds during the construction phase. He typically obtains these figures from the bidders' proposals or from the contract with the selected contractor.
- The user has the ability to override all annual macro-economic country figures such as the inflation and currency exchange rates.
- The user also has the ability to override all annual market survey figures (product demand and prices)
- The user sets the draw down of equity and loans during the construction phase. He typically obtains these figures form the lenders' proposal or from the loan offer/documentation.
This version can also be used during the planning and development phases of a project (as Project Developer).